Applicationas
1.Tunnel excavation and finishing: During tunnel construction, the contour is adjusted, areas with insufficient excavation are dealt with, and local protruding rocks are removed.
2.Rock slope treatment: Repairing the rock slopes beside roads and railways, removing dangerous rocks and conducting surface form treatment.
3.Ice-breaking and snow removal operation: In northern ports, roads, etc., the thick ice layers are broken up and the accumulated snow is compacted to ensure safe passage.
4.Foundation excavation of buildings: In narrow areas where large machinery cannot be used, manual foundation excavation and rock crushing are carried out.
5.Road surface maintenance: Remove the damaged asphalt or cement concrete pavement layer to prepare for re-laying, carried out precisely and efficiently.
Item No. | G10 |
Working Pressure | 0.4-0.63Mpa |
Length | 580MM |
Weight | 10.5KG |
Cylinder Diameter | 80mm |
Piston Stroke | 155mm |
Impact Frequency | ≥16HZ |
SCFM | ≤ 26 |
Inner diameter of air pipe | 16mm |
Bit Shank Size | Φ24*70mm |
Drill Depth | 5m |